NEM Energy Services – Technical advisor for Super heater 3 & 4 modifications on HRSG 1 & 2 at Alcoa/Alinta Power Station, Pinjarra WA.
CH2/UGL – Supply of Fabrication inspection personnel for the installation inspection of ASME B31.1 piping to 5 x HRSG’s and also supply of AICIP inspectors for commissioning inspections of the CCPP ancillary equipment
7 Eleven – In-Service inspections (air receiver inspections) 523 inspections conducted at 7Eleven petrol station sites in Victoria, New South Wales and Queensland.
Retzos Group – In-Service inspection (pressure cooker inspections) conducted at 55 KFC sites in Victoria
Origin Energy – Darling Downs Power Station QLD, Design verification and site erection inspection of 3 x HRSG’s (incorporating 3 x GE 9E Gas turbines of 120 MW each and 1 x steam turbine of 270 MW capacity) and Auxiliary vessels.
Austrian Energy – Condamine Power Station QLD, Design verification of an 86.6 MW HRSG and Auxiliary vessels.
BHP Billiton Worsley Alumina Pty Ltd – Worsely E&G Project, Third Party inspection of the Erection Contractor (Austrian Energy Australia) for their compliance to ASME.
JKC Australia Pty Ltd – Management of a team of inspectors to conduct commissioning inspections on over 1000 items of pressure equipment at the Ichthys onshore LNG facility.
RCR Energy Services - Yarnima Power Station Project, Fabrication inspection of 3 x Heat Recovery Steam Generators (HRSG) for compliance to AS1228 (Manufactured in Thailand)
Sino Iron - Karratha, 450MW Combined Cycle Power Plant. CMIS witnessed hydrostatic testing of 6 HRSG's and providing NATA endorsed report.
BHP Olympic Dam - Yearly inspection of the smelter waste heat boiler and the acid plant waste heat boiler.
Energy Plant Solutions (New Zealand) - Design Verification and Fabrication Inspection of a Water Tube "D" Type Package Boiler and a Small Fire Tube (Shell Boiler).